Our company is looking for the reliable partner in design the equipment for oil drilling. We are working this field in Russia for several years and have direct contracts with the biggest Russian oil companies.
We are the producers of wide range of oil chemical and oil machinery equipment. We kindly ask you to regard the opportunity of mutual co-operation in technical design of automatic group meter stations.
We are interested in implementation of new relations.
The average daily flow rate of one drill hole, ton per day:
1,5,7150
The volume of associated gas in normal conditions, normal cubic meter per day:
500,7200000
The quantity of associated gas in normal, cubic meter per ton:
130-1000
The volume of water in fluids, (%):
0-100
Kinematic viscosity of liquid, (St under 20 ))
3,3 -3,75
Fluid gravity (density), kg per cubic meter:
690 -1200
Oil density, kg per cubic meter:
690 -860
Working substance (fluid):
Oil gas water emulsion with the content of H2S up to 6%:
Operating pressure (PN):
- oil (Mpa)- up to 6.3
- gaslift gas (Mpa) - up to 10
Testing pressure during hydro trials:
- oil (Mpa) - up to 7.88
- gaslift gas (Mpa) - up to 12.5
Working substance temperature:
- oil - 0 -+20
- gaslift gas - 0 -+20.