Remote Architecture Job In Engineering And Architecture

Mat lab sound modeling

Find more Architecture remote jobs posted recently Worldwide

I need a device created on Matlab lab that finds the resonance of water and uses infra or ultrasonic sound ways to manipulate it.
About the recuiter
Member since Mar 14, 2020
Deepak Kataria
from Thuringia, Germany

Skills & Expertise Required

Electronics Matlab 

Candidate shortlisted and hiredHiring open till - Sep 15, 2020

Work from Anywhere

40 hrs / week

Fixed Type

Remote Job

$347.31

Cost

Looking for help? Checkout our video tutorial
How to search and apply for jobs

How to apply? Do you have more questions about the Job?
See frequently asked questions

Similar Projects

Looking for an electrical engineer

The job is replacing a fuse inside a control box of a prototype of a coffee machine. The machine has been put on 220v while it could only bear 110v. Now the fuse needs to be checked and replaced. You need to be in Los Angeles, Santa Monica or Venice....read more

DC electrical assistance for submarine/speedboat final testing

Its a tested speedboat/submarine concept vessel. I need to add to team in order to return to water for subsea hover thrust tests. Initially, only a small amount of help will be needed. For example, we need guidance finding the right speed sensor f...read more

Circuit and PCB design for a 15 segment display

Looking for creating a mini two digit -15 segment display with increment and decrement buttons. The display should be integratable with esp8266 and multiple displays should be integratable.

The height of the display cannot be more than 5mm....read more

Pseudo Code, algorithm and MATLAB evaluation

I have an algorithm with steps, I need algorithm in professional way plus pseudo code. Also, I need the MATLAB verification of the algorithm, in terms of delay and computation overhead.
The reference paper how I would want the results is provided...read more

Building A Microgrid Using Simulink

Creating a microgrid of three building using existing data of essential loads, pv generation and energy storage. The data consist of 1 reading every 5 minutes for 1-day. The system should have a switch a PCC that disconnects the loads from the main...read more