Remote Architecture Job In Engineering And Architecture

Electrical engr to recommend device extract preferential power from a common 400V transformer

Find more Architecture remote jobs posted recently Worldwide

Need an Electrical/electronics engineer who can recommend a device which helps draw preferential power from a common transformer. Details as follows:- A total of 9 pumps are working on One Transformer which feeds 3 other farms and we being the fourth. The other 3 farms have 7 Pumps connected to this transformer . The other 3 farms are situated nearer to the transformer and we are the furthest. The Electric supply voltage fluctuates between high and low and this depends on how many Pumps are working simultaneously at a time i.e. on the Load. The Safety Tripper trips often. Our farm ( 4th farm) receives an Electric supply of 335V to 340 V only but required 400V. Hence we are not getting enough electrical mains supply. Is there any electrical/electronic device that an expert can recommend that when fitted on our farm (4th farm) electrical supply, gives preferential drawing of power to us than the other 3 farms.
About the recuiter
Member since Mar 14, 2020
Kuldeep
from Haut-Congo, Democratic Republic of the Congo

Open for hiringApply before - Aug 15, 2024

Work from Anywhere

40 hrs / week

Fixed Type

Remote Job

$47.86

Cost

Offer to work on this project closes in 93 days!
Are you interested in this Opportunity?

Looking for help? Checkout our video tutorial
How to search and apply for jobs

How to apply? Do you have more questions about the Job?
See frequently asked questions

Similar Projects

Question on Drainage Code

Im building an addition and am wondering about the requirements and spacing specifically for foundation drainage and water heater drain. Ill share the plans I have but not sure what else to do and Im not great at interpreting building codes and ou...read more

Architecture

Looking for an architect to draw up a plan for an addition we are building that we can submit to the city for our permits. Plan is simple and straight forward. Just needs to include electrical, structural points and a few other key components for cit...read more