Find more Architecture Remote Jobs posted recently Worldwide
Required Engineering,Computer Engineering,Software Architecture freelancer for Engineering Q for foundation wall job
Posted at - Apr 27, 2024
Toogit Instant Connect Enabled
We're building an addition and realized the stem wall(or foundation wall?) will need to be higher than the current structural posts we plan to keep. This means the wood will sit approx 4" inside the wall. Is this ok or what are potential solutions if not?
About the recuiterMember since Mar 14, 2020 Rhea Gandhi from al-Karak, Jordan